Ceramic Industry

Sacmi: Rapid Double Fire Plant

October 15, 2003
The second phase of the new rapid double fire plant at the Keramin Joint Stock Co. was recently put through final testing. Supplied by Sacmi, the new line can produce 7400 m(2) of 200 x 300 x 7 mm wall tiles per day. This renovation project has allowed Keramin to replace its old double fire lines completely. The new line has resulted in a considerable increase in both output capacity and product quality, while also providing considerable savings of natural gas consumption.

For additional information, visit http://www.sacmi.com .